|
The Mount Baker Terminal at
Mukilteo. Funded by the State of Washington and designed to receive
large 787 parts, Boeing instead is using the Large Cargo Freighters to
bring parts to the Everett factory. Boeing says it will use the terminal
to receive oversize parts for other airplanes and as a backup if the
LCFs develop problems. The rail-mounted gantry crane was installed
February 14, 2008. |