Mount Baker Terminal
The Mount Baker Terminal at Mukilteo. Funded by the State of Washington and designed to receive large 787 parts, Boeing instead is using the Large Cargo Freighters to bring parts to the Everett factory. Boeing says it will use the terminal to receive oversize parts for other airplanes and as a backup if the LCFs develop problems. The rail-mounted gantry crane was installed February 14, 2008.