| Berne to Merritt October 2008 | ||
![]() |
| Engineers checked the tunnel alignment during construction with a theodolite mounted on this iron pipe. | |
![]() |
![]() |
| Winton to Cashmere October 2008 | ||
![]() |
| Water flowed to the powerhouse through an eight foot diameter wood pipe. The pipe was above ground except for a short section through a tunnel about a mile downstream from the dam. | ||
![]() |
![]() |
![]() |