| Ship containers
with Boeing airplane parts are unloaded at the Port of Everett and barged to the Mount Baker Terminal, loaded on a train, then moved up the hill to the Boeing Everett factory. Operations began at the terminal May 2, 2008. |
| BNSF train with 737 fuselages exits the Cascade Tunnel. | ||